<thead id="wtvt8"></thead>

      <label id="wtvt8"></label>
        1. <li id="wtvt8"><big id="wtvt8"></big></li><span id="wtvt8"><optgroup id="wtvt8"></optgroup></span>
            国产黑色丝袜在线播放,97视频精品全国免费观看,日韩精品中文字幕有码,在线播放深夜精品三级,免费AV片在线观看网址,福利一区二区在线观看,亚洲深夜精品在线观看,2019亚洲午夜无码天堂
            上海鼎振儀器設備有限公司
            中級會員 | 第10年

            13472521719

            FORD BI107-05熱沖擊測試儀

            時間:2018/2/7閱讀:1902
            分享:

            E1
            e2
            e3

             

                                                               Application
            This procedure is used to determine the resistance to coating adhesion loss of coated surfaces of aluminum,plastic, steel, and other substrates when subjected to a wet blast similar to that produced by vehicle wash equipment.

             

             

                                       Apparatus and Materials Required
            Film Thickness Gauge
                  per Ford Laboratory Test Method BI 117-01
            Carbide Tip Scribe
                  CTS (General Scribe #CM 88) - or equivalent
                 12015 egraph Rd.
                 Detroit, Michigan U.S.A.
                 (313) 531-7668
            Utility Knife
                  Stanley, Quick Point 10-300 - or equivalent
                 (break away tips)
            Water Immersion Tank
                 Per Ford Laboratory Test Method BI 104-01
                Note:  Thermal shock testing requires:
                    a.  38 +/- 2 °C water temperature
                    b.  5 ppm maximum dissolved solids
            Heater/Circulator
                   Fisher Scientific 13-874-70J - or equivalent
            Dissolved Solids Meter
                  Myron L Company - or equivalent
                  833 East Broadway
                  San Gabriel, California
            Freezer
                  Capable of minus 29 +/- 2 °C temperature 

            Steam Generator
               a.  Input flow of water to be 2.7 +/- .1 L/min (*).
               b.  Nozzle diameter to be 12.5 +/- .3 mm ID and at least 100 mm long.
               c.  Discharge dynamic head to be 37.9 +/- 1.9 kPa measured 25 mm from the nozzle  using 
            ??       a   4.7 mm ID tube. A substantially non-diverging discharge is required for this test (**) 
            ??    (***) (see Figures 1 and 2).
            Note:  Electro-Magic Model 100 (and the earlier Model 60) Steam Generator available only 
                  from:Atomic Cleaning Systems, 31651 West Eight Mile Road, Livonia, MI 48150, Phone: 
            ??       (248) 615-4400, has been found to be satisfactory. The Model 100 or Model 60 are no 
            ??       longermanufactured directly by Electro-Magic. However, Atomic Cleaning Systems is
            ??       capable ofmodifying new Electro-Magic models to meet the Model 100 specifications
                   required for this test.Milwaukee 1/2 inch globe valve No. 1151-1161, 150 SWP 300 WOg
            ??      is adequate for use in  standardization of generator.
            Model 100 Steam Generator
            (*)    The pumping pressure is directly related to the input flow rate. The pressure needed for
                    therequired flow can be determined by measuring the pump pressure and discharge
                    flow rate withthe burner off. When the burner is turned on, the required flow rate is
            ??        obtained by readjusting to the required pump pressure.
            (**)    This is done by placing the tube midstream 25 mm from the nozzle. The tube size must  
            ??         not bevaried because the densities and velocities are not uniform throughout the cross
            ??        section of thedischarge stream.
            (***)  Adjusting the discharge dynamic head may be required. This must be done in such a
                  way thatthe input flow rate as specified in Para (a) above is maintained. This is done by
                 adjusting the amount of heat transferred to the water. Increasing the heat will cause the
                 flow rate (pressure) of (a) to change. It must be readjusted. This operation will result in an
            ??      increased dynamic pressure; to decrease it, decrease the heat and then adjust the flow
            ??    (pressure).

            Thermometer
            ??       Capable of measuring 100 +/- 2 °C
            Face Mask
                  Full face cover safety mask is required when performing this test.
            Gloves
                 Gauntlet-type gloves for protection of hands are required.


                                                Conditioning and Test Conditions
              All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 ??C and 50 +/- 5 % relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified.

                                                                      Procedure
            1.  Standardize the Model 60 or Model 100 Steam Generator.
                a.  Measure and maintain the input flow at 2.7 L/min. Install a 12.5 mm globe valve in the
            ??        steam line between coil weld assembly and a 5/32 inch hose nipple. With burner off,
            ??         engage pump and adjust globe valve until 2.7 L/min is obtained.
                    Record the tank pressure that is obtained with the 2.7 L/min flow rate. (This induced
                     back pressure simulates the pressure that steam exerts on the system while the burner
                     is on.)
               b.  Measure and maintain the mean dynamic head at 37.9 kPa (5.5 psi) using the fixtures as
                   described in Figures 1 and 2. Open globe valve and turn on the burner. Allow tank
            ??       pressure   tostabilize before reading the mean dynamic head. Adjustments of the
                   dynamic head are to be  made by changing the amount of heat transferred to the water
            ??       at the burner. (The flow  rate, as  specified above, must be maintained.)
                c.  Measure and maintain a 98 +/- 2 °C temperature of the steam blast at the test
            ??        sitedistance.

            2.    Measure film thickness per Ford Laboratory Test Method BI 117-01 at proposed test sites
                 and record.
            3.  Immerse the parts or panels (previously prepared per Engineering Materials Specification)
            ??     in the water immersion tank for four hours at 38 +/- 2 °C. Aerate the water by placing 6.5
            ??     mm ID plastic tube at the bottom of the tank and bubble air at a rate of one bubble per
            ??     second minimum. Maintain a 5 ppm maximum dissolved solids (as NaCl) in the water.
            ??     Check and record NaCl level using a dissolved solids meter.
            4.  Remove the samples after four hours of water immersion and cut an "X" through the
            ??      coating into the substrate across the panel or part where feasible (see Figure 3).
                  a.  Use a scribe to make the cut if the substrate is metal or hard, rigid plastic.
                  b.  Use a utility knife to make the cut if substrate is an elastomeric material.
            5.  Place the test samples in a freezer at minus 29 +/- 2 °C for a three hour minimum freeze
                cycle.
            6.  Within 30 seconds from freezer removal, direct the steam blast at the center of the "X" cut,
            ??    at a distance  of 2 to 3 inches and 45° to the sample, in the direction shown in Figure 3.
             Note:  High pressure wet steam represents a potential safety hazard. Not only is it necessary|
                        to secure the samples properly, but full face protection and gloves are required.
            7.  After 30 seconds, record area (mm2) of coating removal by visually measuring with a
            ??      metric ruler  (typical triangular coating removal: Area = 1/2 Base x Height). Also examine
            ??      the surface and report  any blushing, whitening, or loss of gloss.
            8. If a failure occurs, note number of seconds after steam black initiated that the failure 
                  occurred.


            Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly.
            Each party is responsible for determining proper use and handling in its facilities.
                                                                 ATTACHMENT ONE
                                                                  RATING SCALE FOR
                                                         THERMAL SHOCK TEST PANELS

                                                                RATING               PEEL BACK
                                                                        20      =       No removal
                                                                        19      =       < 0.5 cm^2
                                                                        18      =       < 1.0 cm^2
                                                                        17      =       < 1.5 cm^2
                                                                        16      =       < 2.0 cm^2
                                                                        15      =       < 2.5 cm^2
                                                                        14      =       < 3.0 cm^2
                                                                        13      =        < 3.5 cm^2
                                                                        12      =        < 4.0 cm^2
                                                                        11      =        < 4.5 cm^2
                                                                        10      =        < 5.0 cm^2
                                                                         9       =         < 5.5 cm^2
                                                                         8       =         < 6.0 cm^2
                                                                         7       =         < 6.5 cm^2
                                                                         6       =         < 7.0 cm^2
                                                                         5       =         < 7.5 cm^2
                                                                         4       =         < 8.0 cm^2
                                                                         3       =         < 8.5 cm^2
                                                                         2       =         < 9.0 cm^2
                                                                         1       =         < 9.5 cm^2
                                                                         0       =          > 9.5 cm^2
                                              SEE SPECIFICATION FOR ACCEPTANCE CRITERIA RATING

             

            undefined
                                                                    Figure 1

            undefined

                                                                     Figure 2

             undefined
                                                                             Figure 3

            undefined
                                                                Figure 4

            會員登錄

            ×

            請輸入賬號

            請輸入密碼

            =

            請輸驗證碼

            收藏該商鋪

            X
            該信息已收藏!
            標簽:
            保存成功

            (空格分隔,最多3個,單個標簽最多10個字符)

            常用:

            提示

            X
            您的留言已提交成功!我們將在第一時間回復您~
            撥打電話
            在線留言
            主站蜘蛛池模板: 在线免费成人亚洲av| 2019国产精品青青草原| 亚洲av成人在线一区| 4hu44四虎www在线影院麻豆| 99福利一区二区视频| 麻豆一区二区中文字幕| 国产草草影院ccyycom| 无码精品人妻一区二区三区中| 奇米四色7777中文字幕| 在线 欧美 中文 亚洲 精品| 中文字幕人妻在线精品| 欧美野外伦姧在线观看| 亚洲一区成人av在线| 亚洲精品宾馆在线精品酒店| 最新国产精品亚洲| 亚洲高清成人av在线| 四虎永久免费精品视频| 少妇xxxxx性开放| 青青青爽在线视频观看| 日本一区二区三区专线| 精品无码国产日韩制服丝袜| 精品亚洲女同一区二区| 亚洲AV国产福利精品在现观看| 四虎国产精品永久在线| 少妇被黑人到高潮喷出白浆 | 极品少妇无套内射视频| 日本午夜精品一区二区三区电影| 国99久9在线 | 免费| 国产福利深夜在线播放| 国产精品一区中文字幕| 成人av午夜在线观看| 亚洲精品日本一区二区| 亚洲人成电影网站色mp4| 深夜视频国产在线观看| 麻豆国产AV剧情偷闻女邻居内裤 | 91福利视频一区二区| 亚洲色成人一区二区三区 | 91中文字幕一区二区| 国产成人一区二区三区免费| 无遮无挡爽爽免费视频| 亚洲一区在线成人av|